2018 – Country Malt Group Hops Cooler

While not the largest project Brrr has undertaken, the crane set that was required to place the two condensing units on the building roof was quite a spectacle. The crane required four semi-trailer flatbeds to bring in the necessary counter-weights to make the 200′ reach to the condensing pads on the roof.